WORK EXPERIENCE- Floor plan for exhibition event. Difficult process and took me 4 hours to do but i have never made a floor plan before so this was a fantastic experience because now i know how.
Here is a another floor plan how ever this one i designed for the public to interact with. It designed it for a the brochure with will be given out at the exhibition opening. This took me 5 hours to do.
Cad design i done for the curator to edit. This design took me 6 hours to create. the length of time is a bit mad so maybe i need to work under a pressure and i maybe i will work more efficiently.
This is the space for the exhibition. The opening is on Saturday 22nd February 2014.